SEO software
development: How can you control a project without measuring it?
When a project is in process and do not have any
issues, measurement is necessary. How can you determine if your
project is not in trouble if you do not measure its health?
Measurement is required for assessing the status of your
projects, procedures, products and resources. Because
you never know what might happen in a project. That is why it is
necessary to record and register a project’s both
good and bad characteristics. You see we must control our project and
not just run them. How can you control a
project without measuring it?
There are many reasons to consider project measurements; as a
result the measurement will be a quality
engineering activity. It is not sufficient if you only measure your
software, you should be specific in what your
managers require to know and what your end-users need to be informed.
For instance managers need to know:
- The project’s cost: You need to know the time and effort
involved in different processes that compromise your
software production
- Staff’s productivity: You should find out how long does it
take for your employees (programmers) to design it,
program it and test it.
- Coding quality: You should measure software quality such as:
registering problems, failures, changes and
predict whether the project will be successful. You should set target
for your software processes
- User satisfaction: One need to measure all steps that have
been implemented in project according to user’s
requirement. You should measure usability, reliability, response time
and software performance
- Improvement factors: You should measure the time it takes to
perform every development activity and calculate
the benefits of each part in order to find out whether or not the
benefit is worth the project cost
What engineers need to know when
developing a project?
- Testing : An engineer should analyze each process to
determine objective ways and process’s functionality. For
instance: how to find out if a system is reliable and find out its mean
time to failure must be greater than 16
elapsed hours of CPU time.
- Finding faults: Measuring number of faults in the use case,
design, code and testing plan. You should trace
back to their root causes
- Process goals: characteristic of processes that tell you
whether you have met the standards and met the
process goal
- Predicting the program performance in future: To measure
future maintenance problems. By investigating current
processes, you will be able to future problems.
Why we do measure software? We need to understand, control and
improve the program. You see measurement is
important in three steps: first, we will understand what is happening
during our software development and
maintenance. By establishing the base line we will be able to set goals
for our product in order to predict its
future behavior. Second, Measuring software allows us to control it and
understand its goals and find out whether
we can meet those goals or not. Third, software measurement helps us to
improve processes for example: we can
augment the number of type of design we do based on measurement of
software quality and design quality.
In conclusion software measurement is necessary to improve
software quality and usability.
|